Sector Service
Service:

Southwest Prime RM

Term commission as part of the Debut team for construction and maintenance across the MOD Estates in the Southwest of England. Projects included a new Bowser Park/Workshop and a Dry Scuffing at Yeovilton; Squadron Lines and Int/Ops buildings and a new controlled humidity garaging facility. The project consisted of ground floor production and storage, with first floor office facility incorporating high degree of I.T./communication function.

“The South West Prime project was the first to be completed at RM Poole under the South West Regional Prime Contract. This was an extremely challenging project which included a number of changes being introduced during construction to meet the end users specific requirements.”

Chris Mitchell

southwest-prime-rm-poole
AWW worked very well with not only us but the end user, to ensure that the very specific requirements of the project were captured in the final design process. We have a very select delivery chain, AWW is a very valued member of that team. AWW continues to deliver at all levels across the board. It is always a pleasure to work with Bob Drew and his team, nothing is too much of a problem along with his positive ‘can do’ approach. Andy Lumsden

Project Specification

£4.9 million
2005
Chris Mitchell